< All Projects
Huntington: Northside Interceptor
Location
Huntington, IN
Client
City of Huntington
Project Dates
10/2023–11/2025
Type of Work
Public
Services
GPS Site Grading, Public + Private Construction, Sanitary Sewer
Scope
Atlas installed 8,100 linear feet of large-diameter sewer pipe as part of Huntington’s Long-Term Control Plan (LTCP).
The project involved deep excavation up to 35 feet in town, the construction of a 90-inch tunnel liner plate under an active railroad, the handling of contaminated soil, and groundwater treatment.
Unique Challenges
Working through a residential area required precision and constant communication with the city officials, engineers, and local homeowners. Rock removal was a major challenge — we tested several methods and closely monitored production using our rock grinder attachments.
Despite the depth, contaminated soils, and tight urban environment, our team kept the project moving safely and efficiently.